Wyo. Stat. § 18-5-202 — 18-5-202(b) may participate in efforts to coordinate the plan
(xiii) If required under W.S. 18-5-319, plans for the construction of perimeter fences, including the type of perimeter fence to be constructed, the materials to be used and the subdivider's plan for paying the costs of the perimeter fence and the construction of the perimeter fence.
(b) The board shall require the applicant to obtain review and recommendations from the local conservation district regarding soil suitability, erosion control, sedimentation and flooding problems. The review and recommendations shall be completed within sixty (60) days.
(c) Upon receipt of a subdivision permit application filed with a county and prior to subdivision permit approval, the county or subdivider shall send three (3) copies of the portions of the application prepared under this section to the department of environmental quality for review of the safety and adequacy of the proposed sewage system and proposed water supply system. The review shall be conducted in accordance with the following guidelines:
(i) The department may request assistance from the state engineer, the Wyoming water development office and any other state agency or local governmental entity in preparing its review. Any agency or entity requested to assist in the review shall fully cooperate to the extent possible with the department and shall furnish the information or recommendations requested within the time period specified by the department;